Thank you to the ever popular magazine Planning in London for featuring our solution to re-establish the Hammersmith Bridge connection while lengthy repairs take place.

The magazine selected five entries to feature in their article and we are pleased to be amongst good company:

“Architects Adams + Collingwood offer a hybrid solution. Lifting the bridge off its piers; reusing them for a vierendeel structure to provide a new roadway and then reassembling the old bridge on top with lifts at each end to allow people to get on high to watch Cambridge beat Oxford in the annual boat races.”

You can read the full article here (opens PDF).

Source: planninginlondon.com, October-December issue 2019